RFQ Checklist
- Define target frame size candidates and motion load profile
- Provide torque-speed target point plus duty cycle
- Confirm shaft interface drawing revision and tolerance notes
- State prototype quantity, MP forecast, and destination
Standardized NEMA 8/11/14/17/23/24/34/42 product lines for industrial motion platforms with OEM-ready customization options.

| Metric | Typical Range | Why It Matters |
|---|---|---|
| Frame size coverage | NEMA 8 to NEMA 42 | Supports one-vendor strategy across multiple machine modules. |
| Holding torque band | 0.03 to 12+ N·m (model dependent) | Sets static reserve before dynamic validation at speed. |
| Winding strategy | Low-voltage/high-current to high-voltage winding | Determines driver pairing and thermal envelope. |
| Typical prototype lead time | 7 to 21 days (custom scope dependent) | Affects NPI gate planning and pilot schedule. |





Yes. We support NEMA 8 to NEMA 42 under one process flow, with size-by-size technical confirmation during RFQ.
No. Final selection should use torque at target speed, acceleration profile, and thermal constraints.
Share target speed-torque point, electrical window, interface drawing, and quantity plan in the first email.
Inquiry Email